EXPERT TIMBER FLOORAYING

Floorlaying

Expert Floorlayers

At Element Flooring we specialise in professional timber floor laying services, delivering exceptional craftsmanship with every project. Our expert team has years of experience installing high-quality timber flooring, ensuring a seamless and durable finish that enhances the beauty and value of your space. Whether you’re looking to install timber in a new build or update an existing room, we tailor our services to meet your unique needs and deliver results you’ll love for years to come.

We take pride in our attention to detail and commitment to customer satisfaction. From helping you select the right timber to ensuring a smooth installation process, we’re here to guide you every step of the way. If you’re considering timber flooring for your home or business, get in touch with our team today for a free consultation. Let us bring your vision to life with our expertise and dedication to quality.

QUESTIONS

Floor laying FAQs

The time required for floorlaying depends on several factors, including the type of flooring, the size of the area, and the preparation needed. On average:

  • Preparation: 1–2 days, depending on the condition of the subfloor (e.g., leveling, cleaning, or removing old flooring).
  • Floor Installation:
    • For a standard-sized room (20–30 square meters), laying engineered timber flooring typically takes 1–2 days.
    • Larger areas or complex layouts (e.g., stairs or patterns like herringbone) may take longer.
  • Finishing Touches: Additional time may be needed for skirting boards, trims, or sealing (if required).

In total, most floorlaying projects are completed within 2–5 days, but timelines can vary based on the project’s specifics.

Yes, preparing your space is essential to ensure a smooth and efficient floor installation process. Here’s how you can get ready:

  1. Clear the Area
    • Remove all furniture, rugs, and personal items from the installation space.
    • Ensure the area is free of obstructions for the installers to work efficiently.
  2. Ensure Proper Subfloor Conditions
    • The subfloor should be clean, dry, and level. If repairs are needed, arrange for them before the installation.
    • If moisture is a concern, consider a moisture barrier.
  3. Control Room Conditions
    • Maintain a stable temperature and humidity level (as recommended by the flooring manufacturer) to prevent material expansion or contraction.
    • Allow engineered timber flooring to acclimate to the room for 48–72 hours before installation.
  4. Plan for Access and Power
    • Ensure easy access to the space and provide a power source for tools.
  5. Discuss Details with Installers
    • Clarify any specific requirements, such as moving appliances or dealing with existing flooring, in advance.

Proper preparation not only saves time but also ensures the best results for your new floor.

Yes, timber flooring, including engineered timber, can often be installed over existing flooring, but it depends on the condition and type of the current surface. Here’s what to consider:

Suitable Existing Floors

  • Tiles: Can usually be installed over if the tiles are level and firmly adhered.
  • Concrete: Needs to be clean, dry, and level. A moisture barrier may be required.
  • Vinyl or Linoleum: May work if securely fastened and in good condition.
  • Existing Timber Flooring: Can be installed over if it’s stable, level, and free of excessive movement.

Unsuitable Existing Floors

  • Carpet: Must be removed, as it’s too soft and can lead to an unstable surface.
  • Badly Damaged Floors: Uneven or loose surfaces should be repaired or replaced.

Key Preparation Steps

  1. Leveling: The subfloor must be level to prevent uneven wear or gaps.
  2. Moisture Barrier: Protect against potential moisture issues from the subfloor.
  3. Floating or Glue-Down Method: The choice of installation method depends on the existing floor type and condition.

Always consult a professional to assess your current flooring and ensure compatibility for a smooth, durable installation.

The dust and mess during timber flooring installation depend on the preparation and method used. Here’s what to expect:

What Creates Dust and Mess

  1. Subfloor Preparation: Removing old flooring or leveling the subfloor can produce dust.
  2. Installation Method:
    • Floating Floors: Cleaner, with minimal sanding or adhesives.
    • Glue-Down or Nail-Down: May create more mess due to adhesives or tools.

How to Minimize It

  1. Professional Tools: Many installers use dust-minimizing equipment, like vacuum sanders.
  2. Protective Measures: Plastic sheeting and drop cloths help contain mess.
  3. Cleanup: Installers typically clean up the workspace after finishing.

To prepare, remove small items and protect furniture in nearby areas. Professionals take steps to ensure the process is as clean and disruption-free as possible.

Regular Cleaning

  • Sweep or vacuum regularly with soft-bristle tools.
  • Mop lightly with a damp cloth and pH-neutral cleaner; avoid excess water.

Preventative Care

  • Use rugs at entrances and felt pads on furniture.
  • Wipe spills immediately to prevent damage.

Long-Term Maintenance

  • Re-coat the floor every few years to maintain the finish.
  • Avoid abrasive cleaners or steam mops.

With proper care, your flooring will remain beautiful for years.

CUSTOMER TESTIMONIALS

Our Work

GIVE US A CALL

Enquire now to start your project.

Contact us now to discuss your project and let’s bring your floor to life together!